Introduction to case study:
Star International is an established supplier to the Maritime Sector, servicing a diverse customer base that includes leading Cruise and Ferry operators. With Head Offices based in Birkenhead they have a branch office and warehouse in Southampton and the ware house there needed heating.
Our solution:
The warehouse had an existing gas supply serving a boiler and so the ideal solution to heat the warehouse was a warm air heater supported by an Eliturbo destratification fan to help distribute the warm air and reduce gas consumption by gently recycling otherwise wasted warm air from the roof space to the ground level where it is needed.